TEXAS CORNERS BIBLE CHURCH SANCTUARY CONSTRUCTION PICTURES - 2013/2014



2014.09.29

Front of Sanctuary with Chairs In Place.


Panoramic View of Sanctuary from the Pulpit.




2014.09.24

New church building at night.




2014.08.26

Front of sanctuary.


Panoramic view of back of sanctuary.




2014.08.05

Some of the new plantings required by the local township.


The new front entrance.


Tile work being done by Modern Tile & Carpet.


The new pulpit where God's Holy Word will be brought to life.


The grid work for the new ceiling.




2014.07.23

The Pastor's new office to house his many books.


The hallway, the child drop off station on the left and the library on the right.


The entry way to Secretary's office.


The Narthex.




2014.07.10

The new asphalt.


The Pastor's new domain.


The Pastor getting familiar with the new pulpit.




2014.06.27

We're now waiting for asphalt.




2014.06.16

New baptistry.


The cry room for parents and their children with viewing window, mezzanine for air handling above.


Narthex before interior walls for library, Pastors and Secretaries office are installed.




2014.06.10

Smoothing the new concrete.


Heating coils throughout the entire new building.


Connecting to the city water main.


Narthex floor.


Insulation being sprayed into the walls.


The new siding going on.




2014.05.26

Narthex floor being prepared for in floor heating and concrete.


Sanctuary floor being prepared.


In floor heating tubes and ready for concrete.


Some of the air handling piping for air exchange and air conditioning.


Many of our local contractors are believers in our Awesome Lord, Praise be to God!!




2014.05.20

New Church Steeple Erected




2014.05.04

Panoramic View of Construction Site




2014.04.13

Equipment Outside the West Door, Pastor's Office to the Left, Bathrooms to the Right




2014.03.05

Deep Freeze Shows on the Yet Exposed Framing




2014.02.07

Office and Nursery/Library Wings Being Framed


The Pulpit Area Gets Exterior Siding




2014.01.12

Roof Now on Very Open New Sanctuary




2013.12.12

Steel Beam in Place Over Front of Sanctuary, Trusses Being Installed




2013.12.08

Posts Frame the New Sanctuary Location Behind the Current Church Building


Footings Going In for Connector to Current Church Building


Framework Soars Skyward on New Sanctuary




2013.12.01

Trusses, Other Supplies, and Equipment on the Back Lot




2013.11.16

Initial Footing are Going In for the New Sanctuary




2013.11.03

Work Begins on the Back Lot in November 2013